Читаем Critical Path полностью

With his Rambo-esque antics, Charlie Jackson had actually done Augustus a favor by killing all but one of the council in the explosion. Although there were more councils presiding over other planets and other galactic territories, this one had the most to lose, the oldest members, and Earth was the most prized of all of their colonies.

The only downside to Charlie’s premature actions was that Earth hadn’t been terraformed. But for Augustus’ masters, that was but a minor issue.

The intel he had recovered was of more use.

Augustus closed the blinds, bringing the room into darkness. He sat behind the desk and placed the prism on the top and squeezed the sides until it clicked. A small motor inside whirred. The point of the prism rose up half an inch, exposing a shimmering crystal-like cube inside.

A beam of light came from the crystal, creating a holographic keyboard with alien characters on the keys upon the wooden surface of the desk.

From the drawer, Augustus removed one of the farm’s communication radios. Although the croatoan system was down, it would still transmit, and the signals weren’t intended for an earthly recipient anyway.

Augustus tuned the radio to the given frequency and placed the transceiver next to the prism device. The transceiver crackled as the prism paired to its electronics. The creators of the prism had told him that a true life force existed inside, hence why it could connect to almost any electronic device. The damned thing was intelligent.

Given what he had seen in those early days, he didn’t doubt it.

The hairs on his arms and neck tingled as he brought his hands to the keys. It had been so many years since he had last done this. They had been waiting for him as they had done for hundreds of years before. Every time Hagellan took him out of stasis for education, he’d connect and send a report.

The scale of his masters’ plan blew his mind.

Their foresight planned thousands of years ahead, and so far, from what he had learned, they had never failed.

Even now, their prediction of the council’s demise on Earth had come true. Though he doubted they realized it would come from a single man called Charlie Jackson, but somehow, they had divined it with their algorithms and knew the Order of Things, even if they did not know the specifics.

And here Augustus was, in the middle of it all, part of the Order of Things.

Part of their algorithms and plans.

He tapped out the initiating sequence and waited. A minute later the crystal turned to a royal purple, reminding him of his imperial robes back in the day. A cone of holographic purple light flickered up from above the device, creating an inverse pyramid about a meter tall.

Lines of binary code flowed down the new display until a new form appeared.

His handler.

Drone 21.

These aliens, who called themselves the Scion, were a great binary hive mind, as much as Augustus could work out. He had first ‘met’ Drone 21 when Hagellan had first taken Augustus into the fold. The Scion had an inside croatoan agent working for them, and it was that agent who had handed Augustus the prism, and thus handed over his responsibility. It was Augustus’ job to end that particular agent’s life, having come to the end of his designated algorithm.

Drone 21 had promised the Augustus’ algorithm had no end.

That he would be until the end of time. If he did as they requested.

“Agent 3982, you have a report?” Drone 21 said.

“I do. I have the schematics and data you wanted. I’m uploading now.”

“No need, 3982, I’m transferring now.”

The crystal cube flickered as the data on the device was uploaded to Drone 21’s consciousness.

A few seconds later the holograph of the binary image stopped flickering. An almost-human-looking face turned its attention to Augustus. “You’ve done well, as the Order of Things had predicted,” it said. “Do you have additional information?”

“Indeed,” Augustus said. He summarized Jackson’s escapades and the events at Unity, finishing up with Hagellan’s plans to get to the jump gate.

“We will handle the destroyer,” Drone 21 said, “and Hagellan’s allies.”

“What are my new orders?” Augustus asked.

“Continue with your current plans. Extinguish the threat at Unity and await our arrival. If the Order of Things change, we’ll send you updated information.”

“And…” Augustus was going to ask about his future, his rewards, their promise to give him Earth entirely, but the image on the holographic display had already gone, and the crystal grew dark, cutting off both display and projected keyboard. With a whir, the top of the prism lowered and it became a trinket once more.

A knock came from the door.

Augustus pocketed the prism and picked up the radio.

“Yes?” he called.

The door opened and Zoe entered the room. Her eyes squinted as she looked around. “I thought you were talking to someone.”

He held up the radio. “Just giving orders to a nearby farm. There are a few survivors there,” he said. “What’s the status of those out there?”

Перейти на страницу:

Похожие книги

Ледовый барьер
Ледовый барьер

«…Отчасти на написание "Ледового Барьера" нас вдохновила научная экспедиция, которая имела место в действительности. В 1906-м году адмирал Роберт Е. Пири нашёл в северной части Гренландии самый крупный метеорит в мире, которому дал имя Анигито. Адмирал сумел определить его местонахождение, поскольку эскимосы той области пользовались железными наконечниками для копий холодной ковки, в которых Пири на основании анализа узнал материал метеорита. В конце концов он достал Анигито, с невероятными трудностями погрузив его на корабль. Оказавшаяся на борту масса железа сбила на корабле все компасы. Тем не менее, Пири сумел доставить его в американский Музей естественной истории в Нью-Йорке, где тот до сих пор выставлен в Зале метеоритов. Адмирал подробно изложил эту историю в своей книге "На север по Большому Льду". "Никогда я не получал такого ясного представления о силе гравитации до того, как мне пришлось иметь дело с этой горой железа", — отмечал Пири. Анигито настолько тяжёл, что покоится на шести массивных стальных колоннах, которые пронизывают пол выставочного зала метеоритов, проходят через фундамент и встроены в само скальное основание под зданием музея.

Дуглас Престон , Линкольн Чайлд , Линкольн Чайльд

Детективы / Триллер / Триллеры
Информатор
Информатор

Впервые на русском – мировой бестселлер, послуживший основой нового фильма Стивена Содерберга. Главный герой «Информатора» (в картине его играет Мэтт Деймон) – топ-менеджер крупнейшей корпорации, занимающейся производством пищевых добавок и попавшей под прицел ФБР по обвинению в ценовом сговоре. Согласившись сотрудничать со следствием, он примеряет на себя роль Джеймса Бонда, и вот уже в деле фигурируют промышленный шпионаж и отмывание денег, многомиллионные «распилы» и «откаты», взаимные обвинения и откровенное безумие… Но так ли прост этот менеджер-информатор и что за игру он ведет на самом деле?Роман Курта Айхенвальда долго возглавлял престижные хит-парады и был назван «Фирмой» Джона Гришема нашего времени.

Джон Гришэм , Курт Айхенвальд , Тейлор Стивенс , Тэйлор Стивенс

Детективы / Триллер / Биографии и Мемуары / Прочие Детективы / Триллеры / Документальное