Читаем Critical Path полностью

A pair of shadows moved out of sight.

“Hey, I’m stuck. Help me!”

No response.

The skin on his neck and face prickled with the dawning that they’d abandoned him. Had they led him here on purpose?

The smoke continued to fill the tiny space, making his lungs burn with every breath.

More creaking and rending of metal screeched just beyond the fallen ceiling that pressed Mike against the wall. It sounded like the whole thing would collapse on him, entombing him in alien metal. And he couldn’t even reach his radio, his arms pressed through the gap and the radio crushed behind him, attached to his belt.

Spots began to flash in his vision.

His tight chest made it difficult to breathe, and even then, with each lungful of inhalation, he brought with it the cloying, choking smoke.

“Fuck,” he whispered, closing his eyes as he tried in vain to push back and make some room for himself.

He didn’t know how long he remained in that position, having given up hope he would get out. He thought of Mai and the time they’d spent together. He thought of Charlie and Pippa and their time during the ice age. He saw her face, bright and smiling even though they lived through hell.

A welling-up of grief and sadness made him cough and thrash out his hand through the gap.

He touched something, recoiled his hand and opened his eyes.

“Blinky… help me,” he said as the small engineer looked up at him with wide eyes. For a moment the useless thing just stood there watching, but then, as though finally getting the situation, turned and waved Grumpy back while he ducked out of view. He returned with a pole and passed the end through the bottom of the narrow doorway. He and Grumpy pulled on the other end while Mike leaned his shoulder into the door in an attempt to help.

Nothing budged, despite their efforts.

From just behind the fallen ceiling piece a loud crash came, and the whole ship rocked, jolting the structure. It proved to be useful, however, as with another pull on the pole, the two engineers shifted the door open another foot.

Mike screamed out as he pushed with all he had, driving his shoulder into the door. Something in the mechanism gave, and it finally sprang open, sending Mike crashing forward to the floor with the momentum of his efforts.

The two aliens dropped the pole and dragged him forward.

He spun over just in time to see the door smash closed, just inches from crushing his ankles.

With their help, he managed to stand and regain his balance.

“Thanks, little guys,” Mike said.

They did their blinking and inclined their heads, clicking to each other in short bursts.

With no more exchange of pleasantries, they turned their backs and headed off, consulting a small screen attached to their wrists. They were reading Hagellan’s directions of how to reach the main engine bay’s maintenance section.

Through a dozen more tunnels and levels, twists and tight turns, Mike felt every year of his age in his bones and muscles.

Sweat dripped from his face, and he breathed heavily, wishing he hadn’t volunteered to come along.

Because the engineers were born in Unity, they hadn’t been trained in the proper way of the aliens brought over from their home planet or ones born on the ship. In truth, they weren’t even engineers, Mike just used that term to classify them due to their smaller size compared to the soldiers and the larger still hunters.

With their claw-like hands, they didn’t have the delicate dexterity of humans, especially as they weren’t trained to use the croatoan tools like the original engineers who had perished in the crash and subsequent battles.

Mike’s own tool kit hung around his front in a makeshift sling.

He had no idea if what he had brought would be enough for the task at hand, but if Charlie needed this part to get the ship airborne and stop the threat—if it were real—then Mike would do his best to deal with the situation.

The two aliens stopped in a dark passageway in front of a sheer surface at least two meters high with a meter-high gap at the top.

“Through there?” Mike said, pointing to the gap.

Blink, blink, nod.

Grumpy showed him his screen. A high-res image of a corridor leading to the maintenance room corresponded to what they were looking at now, only this was on an angle and the obstacle in the way appeared to have fallen through the ceiling, blocking access to the tunnel.

“I’ll lift you up,” Mike said, pointing to them and raising his arms.

Blink, blink, nod.

“Right then. Blinky, you first.”

Mike approached cautiously and held back his revulsion as he grabbed the four-foot-tall alien by the waist and lifted it up until it reached out its hands and dragged itself into the gap. “Now you, Grumpy.”

Mike repeated the movement.

Перейти на страницу:

Похожие книги

Ледовый барьер
Ледовый барьер

«…Отчасти на написание "Ледового Барьера" нас вдохновила научная экспедиция, которая имела место в действительности. В 1906-м году адмирал Роберт Е. Пири нашёл в северной части Гренландии самый крупный метеорит в мире, которому дал имя Анигито. Адмирал сумел определить его местонахождение, поскольку эскимосы той области пользовались железными наконечниками для копий холодной ковки, в которых Пири на основании анализа узнал материал метеорита. В конце концов он достал Анигито, с невероятными трудностями погрузив его на корабль. Оказавшаяся на борту масса железа сбила на корабле все компасы. Тем не менее, Пири сумел доставить его в американский Музей естественной истории в Нью-Йорке, где тот до сих пор выставлен в Зале метеоритов. Адмирал подробно изложил эту историю в своей книге "На север по Большому Льду". "Никогда я не получал такого ясного представления о силе гравитации до того, как мне пришлось иметь дело с этой горой железа", — отмечал Пири. Анигито настолько тяжёл, что покоится на шести массивных стальных колоннах, которые пронизывают пол выставочного зала метеоритов, проходят через фундамент и встроены в само скальное основание под зданием музея.

Дуглас Престон , Линкольн Чайлд , Линкольн Чайльд

Детективы / Триллер / Триллеры
Информатор
Информатор

Впервые на русском – мировой бестселлер, послуживший основой нового фильма Стивена Содерберга. Главный герой «Информатора» (в картине его играет Мэтт Деймон) – топ-менеджер крупнейшей корпорации, занимающейся производством пищевых добавок и попавшей под прицел ФБР по обвинению в ценовом сговоре. Согласившись сотрудничать со следствием, он примеряет на себя роль Джеймса Бонда, и вот уже в деле фигурируют промышленный шпионаж и отмывание денег, многомиллионные «распилы» и «откаты», взаимные обвинения и откровенное безумие… Но так ли прост этот менеджер-информатор и что за игру он ведет на самом деле?Роман Курта Айхенвальда долго возглавлял престижные хит-парады и был назван «Фирмой» Джона Гришема нашего времени.

Джон Гришэм , Курт Айхенвальд , Тейлор Стивенс , Тэйлор Стивенс

Детективы / Триллер / Биографии и Мемуары / Прочие Детективы / Триллеры / Документальное