Читаем Critical Path полностью

Free of the croatoan council’s domination, the potential for molding the world to his vision came to him as though it were a gift from the gods he once worshipped.

By now, he knew Jupiter wasn’t a deity, but a discounted destination many miles away in the solar system. None of those celestial bodies truly mattered anymore. They were just one handful of spinning rocks in a universe of infinite numbers.

Earth, however, was the prized gem.

Augustus finished the last of the wine and opened another book that had been salvaged from a destroyed library in one of the nearby towns.

This one was advertised as a ‘science fiction’ novel. He retrieved the scratchy pen and prepared to make his annotations. When he became emperor, the first thing he would do would be to train scribes to rewrite the history books so they were correct, and write fiction that furthered his vision.

Manipulation presented as entertainment was humankind’s greatest discovery, and he was not fool enough to ignore its uses.

Fewer than five pages into this turgid tale of star travelers, Augustus sat up in surprise as one of his spies from the ludus burst in, breathing heavily and attempting to say something.

“What is it?” August snapped, closing the book and standing up. He leaned forward on the desk to peer down at the boy.

“I… saw… Baliska coming this… way.” The boy pointed out of the side window of Augustus’ office.

“When?”

“A… minute or so ago… sir.”

“Stall him. And if you get a chance, kill him.”

The boy just nodded, his eyes wide.

“Actually, no, you won’t stand a chance. Cause a distraction so I can escape. They won’t be expecting me to attack.”

The boy just blinked, trying to get his breath.

“Well, go, then!” Augustus said, shooing the boy out of his office. When he left, Augustus slid the latch across the door and dashed behind the desk. He retrieved one of the croatoans’ pistols from a drawer and waited.

Five minutes later an explosion roared out from the back of the ludus compound. Good!

The boy opened the door and stepped inside. “Baliska’s down, the place is in chaos, go!” He ushered Augustus out and led him through a narrow, twisting corridor and down some steps. A secret passage was hidden behind a locked door resembling a storeroom.

“You did well,” Augustus said. “Lock up behind me.”

The boy nodded and followed the order.

With Baliska out of the picture, that left Aimee vulnerable up there in her manse.

Pulling the hood of his robe over his head to shadow his face, Augustus made his way through the maze of dirt roads and alleys, following a route he had devised that would allow him to reach her stronghold without being seen until he was at the door.

A teenage girl sprang out from a dark doorway of a decrepit shelter, forcing Augustus to sidestep a puddle of crap, and he reached out for her shoulders to stop himself from tripping over.

“Watch where you’re going,” he snapped.

The girl recoiled and stepped back, her face twisting with revulsion.

He reached up and touched his face, forgetting that he no longer wore the mask. He sneered at the girl until she ran off crying. Yes, little girl, you run from monsters, but it will do you no good.

Pulling his hood lower, he set off at a quicker pace, hiding the pistol within the folds of his robe. A few minutes later, his heart rate quickening with effort and anticipation of his next move, he arrived at the doors of Aimee’s stronghold.

A human guard stepped out from the door.

Augustus struck from the shadows.

The single strike on the back of the guard’s head with the solid alien pistol knocked him out with ease. Augustus snuck a look around him. The town was busy as usual. Everyone hurried about their chores.

Above him, two bored aliens leaned over the ramparts, looking down into the town on either side of the stronghold. Neither saw him from their position.

Satisfied he was clear, Augustus dragged the unconscious guard beneath the arch. He opened the heavy doors and stepped into the dark, candlelit interior, hand firmly on the pistol’s grip.

He stayed in the shadows for a moment for his vision to adapt to the drastic differences of light.

The stale air inside carried a chill, due to the thick stone walls, and a pleasant scent of burning incense. The dining area was empty, as was the main meeting hall.

Like a trained dog, he followed the scent of incense, skulking silently through the shadows until he came to Aimee’s bedroom.

Through a gap between the door and the frame, he saw her standing with her back to the door as she put on a dress.

She stopped for a brief moment, her muscles tightening.

Did she know? Could she tell he waited there like a reaper come to claim her soul? Not taking any chances, he barged through the door and dashed across the stone floor.

Aimee spun round, holding her dress to her chest, her eyes wide with surprise and no little revulsion.

Augustus raised his pistol, the barrel just inches from her face.

“Not so confident of your position now, are you, Madam Rivery?”

Перейти на страницу:

Похожие книги

Ледовый барьер
Ледовый барьер

«…Отчасти на написание "Ледового Барьера" нас вдохновила научная экспедиция, которая имела место в действительности. В 1906-м году адмирал Роберт Е. Пири нашёл в северной части Гренландии самый крупный метеорит в мире, которому дал имя Анигито. Адмирал сумел определить его местонахождение, поскольку эскимосы той области пользовались железными наконечниками для копий холодной ковки, в которых Пири на основании анализа узнал материал метеорита. В конце концов он достал Анигито, с невероятными трудностями погрузив его на корабль. Оказавшаяся на борту масса железа сбила на корабле все компасы. Тем не менее, Пири сумел доставить его в американский Музей естественной истории в Нью-Йорке, где тот до сих пор выставлен в Зале метеоритов. Адмирал подробно изложил эту историю в своей книге "На север по Большому Льду". "Никогда я не получал такого ясного представления о силе гравитации до того, как мне пришлось иметь дело с этой горой железа", — отмечал Пири. Анигито настолько тяжёл, что покоится на шести массивных стальных колоннах, которые пронизывают пол выставочного зала метеоритов, проходят через фундамент и встроены в само скальное основание под зданием музея.

Дуглас Престон , Линкольн Чайлд , Линкольн Чайльд

Детективы / Триллер / Триллеры
Информатор
Информатор

Впервые на русском – мировой бестселлер, послуживший основой нового фильма Стивена Содерберга. Главный герой «Информатора» (в картине его играет Мэтт Деймон) – топ-менеджер крупнейшей корпорации, занимающейся производством пищевых добавок и попавшей под прицел ФБР по обвинению в ценовом сговоре. Согласившись сотрудничать со следствием, он примеряет на себя роль Джеймса Бонда, и вот уже в деле фигурируют промышленный шпионаж и отмывание денег, многомиллионные «распилы» и «откаты», взаимные обвинения и откровенное безумие… Но так ли прост этот менеджер-информатор и что за игру он ведет на самом деле?Роман Курта Айхенвальда долго возглавлял престижные хит-парады и был назван «Фирмой» Джона Гришема нашего времени.

Джон Гришэм , Курт Айхенвальд , Тейлор Стивенс , Тэйлор Стивенс

Детективы / Триллер / Биографии и Мемуары / Прочие Детективы / Триллеры / Документальное