Читаем Critical Path полностью

They continued along a side street leading around the edge of town. To their left was a long row of smartly constructed pens filled with sheep, pigs and cows looking healthier than Charlie had seen in the last twenty years. Beyond the animals, crops wavered on the distant steps cut into the basin’s side. Small rickety wooden houses, glorified sheds with washed clothing hanging off the frames, lined the right side. The place stank of shit.

“Did you get me some root?” Charlie said.

She produced a fresh orange piece from underneath her robe. “Take this. There’s plenty more where that came from—if you continue to cooperate.”

Charlie didn’t hesitate. He crammed it into his mouth and chewed hard in order to get the juices flowing down his throat, injecting life into his tired limbs. He’d dismissed escaping after thinking of the planet destroyer heading toward Earth, but he still didn’t trust any of these people or aliens.

The minute he sniffed bullshit or the plan looked like failing, he’d run, get away, and spend his final time on Earth under his terms.

Aimee gestured to her left, and they approached the sinkhole, or attack tunnel as she called it. The dull silver nose cone of a croatoan attack vessel rose from the chasm, slumped to one side, covered in a thin layer of dirt. A gap the size of a door had been cut into the bottom of the giant cone at ground level.

Charlie thought back to when he saw his first one, when he dangled at the bottom of a rope in a sinkhole near Roanoke Sound. It came from directly below him, smoothly rising out of a cloud of electricity-filled smoke. He managed to scramble up the rope and run, along with the rest of the people, before it sent out a pulse jarring through his body and killing anything electronic in the area as the croatoan soldiers spilled out to take control. Shock and awe. Nobody was prepared.

“Don’t be frightened. They mean you no harm,” Aimee said.

She entered the vessel and disappeared to the left. Charlie took a deep breath and followed. Inside, he immediately looked down. In the center, a hundred-meter drop to the bottom of the structure. Several torches were burning at the bottom, providing dull lighting for the off-white interior. A two-meter-wide shallow spiraled platform curled around the edge all the way down.

Aimee didn’t wait and started her descent. The platform’s coarse surface scraped against Charlie’s boots, providing decent grip. As he made his way down, his eyes became used to the light.

Seats ran around the wall, hundreds if not thousands of them, with a raised bar above each, probably used for securing croatoan soldiers as they rose to the surface, like they were on a theme park ride. Below one of the seats, a rusting alien rifle and dusty helmet were secured to the floor with a black plastic strap.

Charlie imagined what it was like thirty years ago. Rumbling upwards, crammed with armed aliens, ready to attack. It sent a chill down his spine.

Only Baliska followed and passed Charlie halfway down. It ran a gloved hand along the wall, touching and feeling various devices, seats and bars. Its clicks increasingly echoed through the vessel as they went deeper.

Near the bottom, two people in brown robes were waiting by the torches. Aimee hurried round the last two circuits of the ship, jumped from the platform, and approached them.

Charlie reached the lower end of the vessel and noticed a jagged edge where the bottom had been cut away. He leapt down the remaining meter drop and landed in a crouching position. Peering around the side of the hulk, he noticed the lower ends of the platform extended out until it disappeared into the Earth. It must have risen like a corkscrew.

“They’re expecting us. Come this way,” Aimee said.

Baliska walked with her through a torchlit cave. Charlie glanced at the two humans Aimee had been talking to and froze.

He instantly recognized one of them. Ben. He grabbed him by the shoulder. “Ben? I thought you were dead. What are you doing here? Where are the others?”

Ben wrestled with Charlie’s arm. “I don’t know who you are. Get the hell off me.”

Aimee turned and strode back. “What are you doing? This is no time to start a fight. Let go of him.”

Charlie kept a tight grip on Ben’s robe and pulled him close. “I’m not letting him go until he tells me what happened to my son and friends.”

“He’s not the Ben you know. This one’s been with us for twenty years,” Aimee said.

“This one? Bullshit. He was with us a month ago. I never forget a face.” Charlie raised his fist. “Tell me now or I’ll beat the living crap out of you.”

Ben leaned away and raised a hand over his face. He shook as he cowered.

“Who is this guy? Aimee, please,” Ben said.

Aimee pulled Charlie’s arm away. “He’s a harvester clone. This is not the Ben you know. There’s hundreds of his type on Earth.”

Charlie didn’t want to believe it. It ripped away the glimmering hope of finding out what happened at the farm after he left in the shuttle. If Denver survived.

Перейти на страницу:

Похожие книги

Ледовый барьер
Ледовый барьер

«…Отчасти на написание "Ледового Барьера" нас вдохновила научная экспедиция, которая имела место в действительности. В 1906-м году адмирал Роберт Е. Пири нашёл в северной части Гренландии самый крупный метеорит в мире, которому дал имя Анигито. Адмирал сумел определить его местонахождение, поскольку эскимосы той области пользовались железными наконечниками для копий холодной ковки, в которых Пири на основании анализа узнал материал метеорита. В конце концов он достал Анигито, с невероятными трудностями погрузив его на корабль. Оказавшаяся на борту масса железа сбила на корабле все компасы. Тем не менее, Пири сумел доставить его в американский Музей естественной истории в Нью-Йорке, где тот до сих пор выставлен в Зале метеоритов. Адмирал подробно изложил эту историю в своей книге "На север по Большому Льду". "Никогда я не получал такого ясного представления о силе гравитации до того, как мне пришлось иметь дело с этой горой железа", — отмечал Пири. Анигито настолько тяжёл, что покоится на шести массивных стальных колоннах, которые пронизывают пол выставочного зала метеоритов, проходят через фундамент и встроены в само скальное основание под зданием музея.

Дуглас Престон , Линкольн Чайлд , Линкольн Чайльд

Детективы / Триллер / Триллеры
Информатор
Информатор

Впервые на русском – мировой бестселлер, послуживший основой нового фильма Стивена Содерберга. Главный герой «Информатора» (в картине его играет Мэтт Деймон) – топ-менеджер крупнейшей корпорации, занимающейся производством пищевых добавок и попавшей под прицел ФБР по обвинению в ценовом сговоре. Согласившись сотрудничать со следствием, он примеряет на себя роль Джеймса Бонда, и вот уже в деле фигурируют промышленный шпионаж и отмывание денег, многомиллионные «распилы» и «откаты», взаимные обвинения и откровенное безумие… Но так ли прост этот менеджер-информатор и что за игру он ведет на самом деле?Роман Курта Айхенвальда долго возглавлял престижные хит-парады и был назван «Фирмой» Джона Гришема нашего времени.

Джон Гришэм , Курт Айхенвальд , Тейлор Стивенс , Тэйлор Стивенс

Детективы / Триллер / Биографии и Мемуары / Прочие Детективы / Триллеры / Документальное