a.
Tests met all planned objectives in restoring all database files.b.
Tests met all planned objectives in using the latest version of the operating systems software.c.
Tests met all planned objectives using files recovered from backups.d.
Tests met all planned objectives using the correct version of access control systems software.56. If the disaster recovery plan is being tested for the first time, which of the following testing options can be combined?
a.
Checklist testing and simulation testingb.
Simulation testing and full-interruption testingc.
Checklist testing and structured walk-through testingd.
Checklist testing and full-interruption testingSimulation testing simulates a disaster during nonbusiness hours, so normal operations will not be interrupted. Full-interruption testing is not recommended because it activates the total disaster recovery plan. This test is costly and disruptive to normal operations and requires senior management’s special approval.
57. Which of the following should be consistent with the frequency of information system backups and the transfer rate of backup information to alternative storage sites?
1.
Recovery time objective2.
Mean-time-to-failure3.
Recovery point objective4.
Mean-time-between-outagesa.
1 and 2b.
1 and 3c.
2 and 3d.
2 and 458. All the following are misconceptions about a disaster recovery plan
except:a.
It is an organization’s assurance to survive.b.
It is a key insurance policy.c.
It manages the impact of LAN failures.d.
It manages the impact of natural disasters.The other three choices are misconceptions. What is important is to focus on the major unexpected events and implement modifications to the plan so that it is necessary to reclaim control over the business. The key is to ensure survival in the long run.
59. Which of the following disaster recovery plan test results would be
a.
Elapsed time to perform various activitiesb.
Amount of work completedc.
List of successful and unsuccessful activitiesd.
Description of each activity60. Which of the following is
a.
Backing up current data and program filesb.
Performing preventive maintenance on computer equipmentc.
Testing the disaster recovery pland.
Housing computers in a fire-resistant area